Aller au contenu
Aperlena

NLV Pharos Dry Dock Services 2027

À venir Avis de préinformation Aucune date limite publiée
Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

Description

The Northern Lighthouse Board (NLB) require Dry Dock Facilities for NLV Pharos to carry out 20 year Special survey works This will include essential works and surveys to meet the Classification Society/Flag state requirements for certification of the vessel. Total estimated timescales for the duration required for the works are 4 weeks, with dry dock works being 3 weeks within this. The services will be provided by both the dry dock facility and external contractors, access will be required for NLB staff and NLB prearranged appointed contractors. Locations within the United Kingdom and Europe will be considered. A full description of the requirements will be detailed within the tender documents available to download from https://www.delta-esourcing.com, once published. Estimated dates for Dry Dock: Arrival Date - 28th January 2027 Layby berth Dry dock works - 1st February - 23rd February 2027 (layby berth) Departure Date: 28th February 2027 Potential suppliers should provide dates that their drydock is available, noting the approximately 4 week required duration for the works. These are the preferred dates but may be flexible to meet drydock availability. We are inviting expressions of interest from suppliers who can provide a Dry Dock location and works, that meet the requirements of NLB. A brief outline is below: NLV Pharos 20 year special survey drydock - Tank/Hull inspection/survey - Ship side valves overhaul/survey - All safety equipment/systems major overhaul/survey Class society: Lloyds Register Full Hull painting Thruster overhauls (completed by OEM) Electrical Healthcare Miscellaneous works including: - ER supply fan overhaul - Helideck equipment maintenance - Mooring equipment maintenance Ship Details IMO Number - 9338606 Length Overall - 84.25metres Breadth Moulded - 16.49 metres Gross Tonnage - 3672T Dry dock blocks - Minimum of 1.5m blocks for ease of access under the vessel. Estimated Tender timeline Tender documents published- 10th August 2026 Tender submission deadline - 8th September 2026 Tender Award - Estimated 22nd September 2026 A reminder that these dates are indicative at this stage and may be subject to change. For more information about this opportunity, please visit the eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Marine-construction-works./M83XK7BG44 To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/M83XK7BG44

Source officielle

Source : Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Find a Tender Service (UK Cabinet Office / Crown Commercial Service) il y a 1 mois

Documents sur Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (anglais)

Plus de cet acheteur

Profil complet de l'acheteur

1 marché ouvert actuellement

Attributions récentes

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
30 530 457 €
29 848 ouverts en Europe actuellement 98% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
9 avis suivis · 2 attribués

Ne manquez plus aucun marché comme celui-ci

Recevez un e-mail pour les nouveaux marchés : Travaux de construction · Royaume-Uni. Gratuit.

Créer mon alerte