A66 - Access and Haul roads

Clôturé Avis de marché
Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

  1. Publié
  2. Date limite ouvert 14 jours
  3. Attribué en attente

Description

The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use. The supplier is required to undertake site clearance, to include but not limited to: Wall removal and set aside for reuse Fence removal and disposal Gate removal and disposal Kerb and drainage removal and disposal Sign post removal and disposal Allowance for removal / cutting of tree root systems and disposal Allowance for hard dig and disposal of arisings

Source officielle

Source : Contracts Finder (UK Cabinet Office)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Contracts Finder (UK Cabinet Office) il y a 1 mois

Documents sur Contracts Finder (UK Cabinet Office) (anglais)

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
30 576 278 €
29 813 ouverts en Europe actuellement 100% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
4 avis suivis · 0 attribués

Ne manquez plus aucun marché comme celui-ci

Recevez un e-mail pour les nouveaux marchés : Travaux de construction · Royaume-Uni. Gratuit.

Créer mon alerte